Evening all.
I’ve just dummy run my show with bulbs (all igniters wired and extended as they will be on the night)
I had 3 bulbs (part of multi cues) that didn’t fire. On deconstruction, I was happy to put this down to poor connection of the bulb, I only unfolded the ends of the bulbs. Once I reconnected them all was fine.
Question is, do I trust this dry run with bulbs, or do I appease my mind and do a full run with e-matches connected? I know everything should be fine, and I hate...
In bulbs we trust?
I’ve just dummy run my show with bulbs (all igniters wired and extended as they will be on the night)
I had 3 bulbs (part of multi cues) that didn’t fire. On deconstruction, I was happy to put this down to poor connection of the bulb, I only unfolded the ends of the bulbs. Once I reconnected them all was fine.
Question is, do I trust this dry run with bulbs, or do I appease my mind and do a full run with e-matches connected? I know everything should be fine, and I hate...
In bulbs we trust?